A platform for research: civil engineering, architecture and urbanism
"Preload" process for construction of circular prestressed concrete structures, in which horizontal prestressing is effected by continuous cable wrapped under tension around entire exterior surface of tank; vertical prestressing is by normal means, wires being stressed by jacking; construction of 2-mg concrete reservoir at Canberra, and 3/4-mg all gunite reservoir at Kyogle, NSW.
"Preload" process for construction of circular prestressed concrete structures, in which horizontal prestressing is effected by continuous cable wrapped under tension around entire exterior surface of tank; vertical prestressing is by normal means, wires being stressed by jacking; construction of 2-mg concrete reservoir at Canberra, and 3/4-mg all gunite reservoir at Kyogle, NSW.
Prestressed concrete reservoir construction
Commonwealth Engr
Jones, G.M. (author)
1954
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of circular prestressed concrete reservoir
Engineering Index Backfile | 1965
|Failure of prestressed concrete reservoir
Engineering Index Backfile | 1966
|Prestressed concrete construction
Engineering Index Backfile | 1951
|Prestressed concrete construction
Engineering Index Backfile | 1950
|Prestressed Concrete Reservoir for Milwaukie, Oregon
Wiley | 1950
|