A platform for research: civil engineering, architecture and urbanism
Materials handling in construction of Grimsel dam
Construction of two concretearch dams, up to 150 m. in height, located in Swiss Alps at elevation of about 2000 m. above sealevel; aerial tramway 17 km. long, was used to transport cement; concrete aggregate was transported by narrow-gage railway and by aerial tramway; concrete mixing and distribution.
Materials handling in construction of Grimsel dam
Construction of two concretearch dams, up to 150 m. in height, located in Swiss Alps at elevation of about 2000 m. above sealevel; aerial tramway 17 km. long, was used to transport cement; concrete aggregate was transported by narrow-gage railway and by aerial tramway; concrete mixing and distribution.
Materials handling in construction of Grimsel dam
Die Foerdertechnik beim Bau der Grimselstaumauern
Franke, W. (author)
Bauingenieur ; 11
1930
7 pages
18 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Super hydro station at Lake Grimsel
Engineering Index Backfile | 1928
Super hydro station at Lake Grimsel
Engineering Index Backfile | 1928
Verbundene Mikroporosität in Kristallingesteinen : Fallstudie Felslabor Grimsel
UB Braunschweig | 1999
|Borehole Sealing Project at the Grimsel Test Site
Online Contents | 2005
|Borehole Sealing Project at the Grimsel Test Site
British Library Online Contents | 2005
|