A platform for research: civil engineering, architecture and urbanism
Installation of Cableway Cranes
Installation at Beuthen, to serve triangular area, for Graeflich Schaffgotsche Werke coal mines; span is 290 m. long, steel frame towers are 36.6 m. high and lifting capacity is 14 tons.
Installation of Cableway Cranes
Installation at Beuthen, to serve triangular area, for Graeflich Schaffgotsche Werke coal mines; span is 290 m. long, steel frame towers are 36.6 m. high and lifting capacity is 14 tons.
Installation of Cableway Cranes
Installation de grue a cables
Genie Civil ; 96
1930
4 pages
10 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1922
|Dragline scrapers and cableway cranes for moving mining excavation
Engineering Index Backfile | 1928
|Heavy-load cableway installation for Owyhee dam
Engineering Index Backfile | 1930
Engineering Index Backfile | 1930
|