A platform for research: civil engineering, architecture and urbanism
Combined bridge consisting principally of three reinforced-concrete arches, of 186.4 m. span and 35.3 rise; materials handling; sinking of caissons; self-supporting formwork for arches was built on land and floated into position. Comments by designer, E. Freyssinet.
Combined bridge consisting principally of three reinforced-concrete arches, of 186.4 m. span and 35.3 rise; materials handling; sinking of caissons; self-supporting formwork for arches was built on land and floated into position. Comments by designer, E. Freyssinet.
Albert Louppe Reinforced-Concrete Bridge Over the Elorn between Brest and Plougastel
Le pont en beton arme Albert Louppe sur l'Elorn, entre Brest et Plougastel
Coyne, A. (author)
Genie Civil ; 97
1930
17 pages
38 Figs., 10 Figs on special plate
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Albert louppe bridge near brest, largest reinforced-concrete arch bridge in France
Engineering Index Backfile | 1931
|Reinforced concrete bridge over the Elorn, Brest
Engineering Index Backfile | 1928
|Reinforced concrete bridge at elorn, brest
Engineering Index Backfile | 1926
|Engineering Index Backfile | 1929
|The 600-ft. concrete arch bridge at Brest, France
Engineering Index Backfile | 1929
|