A platform for research: civil engineering, architecture and urbanism
Experimental ramming and loading for New Limfjord Bridge
Driving of hollow reinforced-concrete test piles, 50 cm. external diam., 23 to 35 m. long; data analyzed in light of Eytelwein formula.
Experimental ramming and loading for New Limfjord Bridge
Driving of hollow reinforced-concrete test piles, 50 cm. external diam., 23 to 35 m. long; data analyzed in light of Eytelwein formula.
Experimental ramming and loading for New Limfjord Bridge
Beretning om proveramning og provebelastning for den nye Limfjordsbro
Kierulff, O. (author)
Ingenioren ; 39
1930
9 pages
9 Figs.
Article (Journal)
Danish
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Bridge architecture at the limfjord and lille belt
Engineering Index Backfile | 1929
Project for the new Limfjord bridge between aalborg and No rresundby
Engineering Index Backfile | 1926
|Post-Tensioning of the Limfjord Tunnel, Denmark
British Library Conference Proceedings | 1995
|Post-Tensioning of the Limfjord Tunnel, Denmark
British Library Conference Proceedings | 1995
|