A platform for research: civil engineering, architecture and urbanism
Project for the new Limfjord bridge between aalborg and No rresundby
Building, of highway bridge across Limfjord is considered difficult task because of bad bottom conditions and strong drift ice in winter; maximum depth is 37 m.; pneumatic caissons to be used; drawbridge in middle; project worked out from some of plans submitted in internation competition.
Project for the new Limfjord bridge between aalborg and No rresundby
Building, of highway bridge across Limfjord is considered difficult task because of bad bottom conditions and strong drift ice in winter; maximum depth is 37 m.; pneumatic caissons to be used; drawbridge in middle; project worked out from some of plans submitted in internation competition.
Project for the new Limfjord bridge between aalborg and No rresundby
Projektet til den nye Limfjordsbro mellen Aniborg og No rresundby
Tybjerg, I. (author)
Ingenioren ; 35
1926
13 pages
12 Figs.
Article (Journal)
Danish
© Metadata Copyright Elsevier B. V. All rights reserved.
Die neue Brueckenverbindung ueber den Limfjord zwischen Aalborg und
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1921
|Engineering Index Backfile | 1931
|Bridge architecture at the limfjord and lille belt
Engineering Index Backfile | 1929
Experimental ramming and loading for New Limfjord Bridge
Engineering Index Backfile | 1930
|