A platform for research: civil engineering, architecture and urbanism
Jacks push culvert into place under railroad
Description of jacking methods which made it possible for Missouri Pacific Railroad to replace in 105 min. old two-panel timber trestle with new double 4 × 5-ft precast concrete box culvert 22 ft long, at Gold Creek, Ark.
Jacks push culvert into place under railroad
Description of jacking methods which made it possible for Missouri Pacific Railroad to replace in 105 min. old two-panel timber trestle with new double 4 × 5-ft precast concrete box culvert 22 ft long, at Gold Creek, Ark.
Jacks push culvert into place under railroad
Construction Methods
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Jacks push big pipe under highway
Engineering Index Backfile | 1959
Jacks between joints push concrete pipes
Engineering Index Backfile | 1965
Floating 150-in multiplate culvert back into place
Engineering Index Backfile | 1941