A platform for research: civil engineering, architecture and urbanism
Lining coast range tunnel for Hetch Hetchy water
Construction of circular concrete lining for 10.5-ft water-supply tunnel designed to meet wide pressure variations in heavy ground; two-step program for paving invert and pneumatic placing of side walls and arch in three-shift operation; aggregate and batching plant; concreting invert; concreting sides and roof.
Lining coast range tunnel for Hetch Hetchy water
Construction of circular concrete lining for 10.5-ft water-supply tunnel designed to meet wide pressure variations in heavy ground; two-step program for paving invert and pneumatic placing of side walls and arch in three-shift operation; aggregate and batching plant; concreting invert; concreting sides and roof.
Lining coast range tunnel for Hetch Hetchy water
Eng News-Rec
Engineering News-Record ; 111
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hetch Hetchy Coast range tunnel
Engineering Index Backfile | 1932
Coast range tunnel of hetch hetchy aqueduct
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1920
Hetch Hetchy tunnel construction
Engineering Index Backfile | 1931
The Coast Range Tunnel of the Hetch Hetchy Aqueduct
Wiley | 1935
|