A platform for research: civil engineering, architecture and urbanism
Design and construction of steel-truss viaduct, 3 mi long, beginning at New Jersey portal Holland Tunnel and cutting diagonally across Hackensack Meadows; determining alignment and profile; piles and caissons used for foundations; roadway provides five traffic lanes.
Design and construction of steel-truss viaduct, 3 mi long, beginning at New Jersey portal Holland Tunnel and cutting diagonally across Hackensack Meadows; determining alignment and profile; piles and caissons used for foundations; roadway provides five traffic lanes.
New Jersey high-level viaduct
Civ Eng (NY)
Mudson, H.W. (author)
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Jersey meadows high-level viaduct
Engineering Index Backfile | 1933
Time study of traffic flow on New Jersey high-level viaduct
Engineering Index Backfile | 1934
|Historical Considerations for New Jersey Viaduct
British Library Conference Proceedings | 1994
|Varied steel-erection practice on New Jersey viaduct
Engineering Index Backfile | 1933
"Sitter" high level viaduct in Switzerland
Engineering Index Backfile | 1945