A platform for research: civil engineering, architecture and urbanism
Arapuni power development
Lining 36,000 sq yd of headrace and forebay with waterproof covering in which concrete, steel and Trinidad natural lake asphalt were combined; reasons for breakdown; details of mastic construction.
Arapuni power development
Lining 36,000 sq yd of headrace and forebay with waterproof covering in which concrete, steel and Trinidad natural lake asphalt were combined; reasons for breakdown; details of mastic construction.
Arapuni power development
Water Water Eng
1933
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Arapuni (New Zealand) hydro-electric power development
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1935
|Online Contents | 1997
|