A platform for research: civil engineering, architecture and urbanism
Special power tools speed transmission line erection
Construction rate of 1.7 mi per day, including clearing of right-of-way, attained in building 70 mi of H-frame, 132-kv line by means of power tools for clearing way, digging holes, framing, erecting and aligning structures and stringing and sagging conductors.
Special power tools speed transmission line erection
Construction rate of 1.7 mi per day, including clearing of right-of-way, attained in building 70 mi of H-frame, 132-kv line by means of power tools for clearing way, digging holes, framing, erecting and aligning structures and stringing and sagging conductors.
Special power tools speed transmission line erection
Elec World
Flynn, W.B. (author)
Electrical World ; 101
1933
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Engineering Index Backfile | 1952
Foundations for transmission line towers and tower erection
Engineering Index Backfile | 1915
|Erection of electric transmission line tower on enclosed lots
Engineering Index Backfile | 1929
|Erection of ultra-high voltage power transmission lines
Tema Archive | 1993
|