A platform for research: civil engineering, architecture and urbanism
Western power line erection
Two transmission lines in Idaho and Los Angeles illustrate different techniques of construction; Los Angeles line carrying 132,000-v power, is supported on steel towers; Idaho wood pole transmission line is 138,000-v covering 120 mi; at points of curvature or strain, three or four-pole structures are erected; description of erecting steel towers and wood poles.
Western power line erection
Two transmission lines in Idaho and Los Angeles illustrate different techniques of construction; Los Angeles line carrying 132,000-v power, is supported on steel towers; Idaho wood pole transmission line is 138,000-v covering 120 mi; at points of curvature or strain, three or four-pole structures are erected; description of erecting steel towers and wood poles.
Western power line erection
Western Construction News
1946
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Special power tools speed transmission line erection
Engineering Index Backfile | 1933
|Steel-penstock erection at western hydroelectric project
Engineering Index Backfile | 1943
|Tower erection methods expedited hoover dam line
Engineering Index Backfile | 1931
|