A platform for research: civil engineering, architecture and urbanism
Builds new Tennessee river bridge
Vertical-lift span 294 ft 4 1/2 in. long is primary feature of new steel truss bridge, total length 1571 ft, across Tennessee River at Danville, Tenn, completed late in 1932 by Louisville and Nashville; pneumatic foundations; erection on falsework; features of lift span and operating control.
Builds new Tennessee river bridge
Vertical-lift span 294 ft 4 1/2 in. long is primary feature of new steel truss bridge, total length 1571 ft, across Tennessee River at Danville, Tenn, completed late in 1932 by Louisville and Nashville; pneumatic foundations; erection on falsework; features of lift span and operating control.
Builds new Tennessee river bridge
Ry Age
Railway Age ; 94
1933
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tennessee gas builds twin froholes
Engineering Index Backfile | 1966
Santa Fe builds new bridge over Mississippi river
Engineering Index Backfile | 1927
CSX Bridge over Tennessee River Slough
British Library Online Contents | 2000
Wabash Ry. Builds new bridge over Sangamon river
Engineering Index Backfile | 1927
|