A platform for research: civil engineering, architecture and urbanism
Rock tunnelling at Kariba
Diverting flow of Zambesi River during period of dam construction at Kariba; tunneling is aiding completion of enterprise by allowing construction work to continue through flood season; method of construction of diversion tunnel measuring 40 ft high by 33 ft wide, and unlined except at portals.
Rock tunnelling at Kariba
Diverting flow of Zambesi River during period of dam construction at Kariba; tunneling is aiding completion of enterprise by allowing construction work to continue through flood season; method of construction of diversion tunnel measuring 40 ft high by 33 ft wide, and unlined except at portals.
Rock tunnelling at Kariba
S African Min Eng J
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1948
|Kariba Instrumentation - An Update
British Library Conference Proceedings | 1997
|