A platform for research: civil engineering, architecture and urbanism
Extension of Berlin underground
Opening of 1 1/2 mi new section in northwestern district; in view of high cost of steel, extension was constructed with tunnel section designed as complete reinforced concrete frame; permanent way is of ribbed plate type K, with rails laid in lengths of 15 m; three stations are about 360 ft long and 26 to 33 ft wide; data on signaling and current supply.
Extension of Berlin underground
Opening of 1 1/2 mi new section in northwestern district; in view of high cost of steel, extension was constructed with tunnel section designed as complete reinforced concrete frame; permanent way is of ribbed plate type K, with rails laid in lengths of 15 m; three stations are about 360 ft long and 26 to 33 ft wide; data on signaling and current supply.
Extension of Berlin underground
Ry Gaz
Railway Gazette ; 105
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground structure extension method using new underground wall
European Patent Office | 2024
|Underground structure extension method using new underground wall
European Patent Office | 2025
Munich Underground Railway Extension in Garching
British Library Online Contents | 2003