A platform for research: civil engineering, architecture and urbanism
Paving methods in widening New Jersey Turnpike
Paving new lanes in midst of heavy traffic carried out successfully due to exacting specifications and advance planning; matching elevation of existing pavement and securing good joint; 6-lane service over continuous 88.3 mi; overlay work; subgrade, subbase and macadam base application; hot mix construction.
Paving methods in widening New Jersey Turnpike
Paving new lanes in midst of heavy traffic carried out successfully due to exacting specifications and advance planning; matching elevation of existing pavement and securing good joint; 6-lane service over continuous 88.3 mi; overlay work; subgrade, subbase and macadam base application; hot mix construction.
Paving methods in widening New Jersey Turnpike
Roads Streets
Roads and Streets ; 99
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tight timetable adds problems to paving of New Jersey turnpike
Engineering Index Backfile | 1951
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1950
|Engineering Index Backfile | 1952
|Engineering Index Backfile | 1952