A platform for research: civil engineering, architecture and urbanism
Length of turnpike is 118 mi; financing by revenue bonds to be repaid by tolls; turnpike is designed for speeds of 70 and 75 mph with 10,000-ft minimum radius and sight distance of 1,000 ft; pavement consists of 4 1/2 in. asphaltic concrete, 7 1/2 in. of penetrated macadam base and 6 1/2 in. gravel sub-base above 18 in. layer of free draining gravel; total cost $6.25 per sq yd.
Length of turnpike is 118 mi; financing by revenue bonds to be repaid by tolls; turnpike is designed for speeds of 70 and 75 mph with 10,000-ft minimum radius and sight distance of 1,000 ft; pavement consists of 4 1/2 in. asphaltic concrete, 7 1/2 in. of penetrated macadam base and 6 1/2 in. gravel sub-base above 18 in. layer of free draining gravel; total cost $6.25 per sq yd.
New Jersey Turnpike
Boston Soc Civ Engrs -- J
Williams, H.J. (author)
1951
11 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1952
Engineering Index Backfile | 1952
|New Jersey turnpike -- Tomorrow's highway built today
Engineering Index Backfile | 1952
Paving methods in widening New Jersey Turnpike
Engineering Index Backfile | 1956