A platform for research: civil engineering, architecture and urbanism
Pier modernization job on San Francisco waterfront involves casting and placing 2000 pretensioned concrete piles; 139 of these are 132 ft long; remaining units are composite -- top 23 to 35 ft is pretensioned concrete, and bottom is timber in lengths up to 104 ft. (p 72, 75, 78, 80, 83, 86) (see also Eng News-Rec v 157 n 3 July 19 1956 p 33-4, 36)
Pier modernization job on San Francisco waterfront involves casting and placing 2000 pretensioned concrete piles; 139 of these are 132 ft long; remaining units are composite -- top 23 to 35 ft is pretensioned concrete, and bottom is timber in lengths up to 104 ft. (p 72, 75, 78, 80, 83, 86) (see also Eng News-Rec v 157 n 3 July 19 1956 p 33-4, 36)
Pretensioned piles are 132 ft long
Construction Methods Equipment
Wise, L.L. (author)
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pretensioned piles for navy pier
Engineering Index Backfile | 1957
|Pretensioned concrete piles -- Present knowledge summarized
Engineering Index Backfile | 1961
|Driving Stresses in Fiberglass Pretensioned Piles
Online Contents | 1993
|Structural Analysis of Pretensioned Concrete Piles
British Library Conference Proceedings | 2013
|Durability and Bond of CFRP Pretensioned Piles. Volume 2
NTIS | 1996
|