A platform for research: civil engineering, architecture and urbanism
Pretensioning is being used for more than 1000 precast concrete piles averaging 76 ft in length for pier at Long Beach (Calif) Naval Station; pier is 50×1700 ft; piles are cast in 45×378-ft bed that accommodates five piles in each of six rows of forms; two rows of forms are arranged to be cast together and covered for steam curing.
Pretensioning is being used for more than 1000 precast concrete piles averaging 76 ft in length for pier at Long Beach (Calif) Naval Station; pier is 50×1700 ft; piles are cast in 45×378-ft bed that accommodates five piles in each of six rows of forms; two rows of forms are arranged to be cast together and covered for steam curing.
Pretensioned piles for navy pier
Civ Eng (NY)
Remington, W.F. (author)
Civil Engineering ; 27
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pretensioned concrete piles -- Present knowledge summarized
Engineering Index Backfile | 1961
|Driving Stresses in Fiberglass Pretensioned Piles
Online Contents | 1993
|Pretensioned piles are 132 ft long
Engineering Index Backfile | 1956
|Structural Analysis of Pretensioned Concrete Piles
British Library Conference Proceedings | 2013
|Durability and bond of AFRP pretensioned piles ; Vol. 1
UB Braunschweig | 1900