A platform for research: civil engineering, architecture and urbanism
Replacement of timber structure by steel piling at Port of Whitby; main features of new construction comprise 2-ft thick reinforced concrete deck slab supported on steel box piles of Larssen Section BP.2 in bents at 15-ft centers longitudinally with 12×12-in. incised and creosoted Douglas Fir fender piles at 7-ft 6-in. centers.
Replacement of timber structure by steel piling at Port of Whitby; main features of new construction comprise 2-ft thick reinforced concrete deck slab supported on steel box piles of Larssen Section BP.2 in bents at 15-ft centers longitudinally with 12×12-in. incised and creosoted Douglas Fir fender piles at 7-ft 6-in. centers.
Reconstruction of Fish Quay at Whitby
Dock Harbour Authority
Rooke, G.W. (author)
1956
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Whitby Fish Quay
Engineering Index Backfile | 1958
|Quay reconstruction at Wallsend
Engineering Index Backfile | 1951
Portsmouth Camber Town Quay reconstruction
British Library Online Contents | 1998
|