Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Replacement of timber structure by steel piling at Port of Whitby; main features of new construction comprise 2-ft thick reinforced concrete deck slab supported on steel box piles of Larssen Section BP.2 in bents at 15-ft centers longitudinally with 12×12-in. incised and creosoted Douglas Fir fender piles at 7-ft 6-in. centers.
Replacement of timber structure by steel piling at Port of Whitby; main features of new construction comprise 2-ft thick reinforced concrete deck slab supported on steel box piles of Larssen Section BP.2 in bents at 15-ft centers longitudinally with 12×12-in. incised and creosoted Douglas Fir fender piles at 7-ft 6-in. centers.
Reconstruction of Fish Quay at Whitby
Dock Harbour Authority
Rooke, G.W. (Autor:in)
1956
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Whitby Fish Quay
Engineering Index Backfile | 1958
|Quay reconstruction at Wallsend
Engineering Index Backfile | 1951
Portsmouth Camber Town Quay reconstruction
British Library Online Contents | 1998
|Reconstruction of Parkeston Quay, Harwich
Engineering Index Backfile | 1955
|