A platform for research: civil engineering, architecture and urbanism
At San Juan river crossing near Bloomfield, NM, 34-in. line was laid across dry bed; bulldozers built dam to divert river and crossing under main channel was completed by dry land methods.
At San Juan river crossing near Bloomfield, NM, 34-in. line was laid across dry bed; bulldozers built dam to divert river and crossing under main channel was completed by dry land methods.
One good way to cross river -- Move it
Pipe Line Industry
Mangan, F.J. (author)
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2006
|ASCE | 2016
|Engineering Index Backfile | 1956
|River channel ecological restoration device convenient to move
European Patent Office | 2021
|Move to Design, Design to Move
TIBKAT | 2020
|