A platform for research: civil engineering, architecture and urbanism
Hydroelectric harnessing of Edea Falls on Sanaga River, Cameroon
Scheme planned to include power plant with 15 turboalternator groups 33.3 Mw each, first three of which have vertical shaft turbines developing 15,500 hp at 214 rpm; capacity 1.2 billion kw-hr foreseen; concrete gravity dam, 400 m long, 37.5 m high; second dam forming right angle, 40 m long.
Hydroelectric harnessing of Edea Falls on Sanaga River, Cameroon
Scheme planned to include power plant with 15 turboalternator groups 33.3 Mw each, first three of which have vertical shaft turbines developing 15,500 hp at 214 rpm; capacity 1.2 billion kw-hr foreseen; concrete gravity dam, 400 m long, 37.5 m high; second dam forming right angle, 40 m long.
Hydroelectric harnessing of Edea Falls on Sanaga River, Cameroon
L'amenagement hydroelectrique de la chute d'Edea
Genie Civil ; 133
1956
6 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
IOP Institute of Physics | 2012
|New merced falls hydroelectric plant on Merced river
Engineering Index Backfile | 1932
|