A platform for research: civil engineering, architecture and urbanism
How to excavate 25 ft. below Water Level
Techniques used in construction of sewage treatment plant near Sparks, Nev, to keep Truckee River out of foundation 25 ft below river level; 6-ft concrete slab must be constructed about 55 ft below ground level to serve as foundation for plant.
How to excavate 25 ft. below Water Level
Techniques used in construction of sewage treatment plant near Sparks, Nev, to keep Truckee River out of foundation 25 ft below river level; 6-ft concrete slab must be constructed about 55 ft below ground level to serve as foundation for plant.
How to excavate 25 ft. below Water Level
Pac Bldr Engr
1965
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Researchers Report Progress In Reducing Need To Excavate
Online Contents | 1996
System and method to excavate using pneumatic shock wave
European Patent Office | 2016
|METHOD AND APPARATUS FOR CONTROLLING EXCAVATOR TO EXCAVATE
European Patent Office | 2020
|