A platform for research: civil engineering, architecture and urbanism
Building 13-mile causeway across sea of salt
Methods and problems in moving 31,500,000 cu yd of rock and gravel fill into place, for railroad causeway across arm of Great Salt Lake, Utah, are described; features of work described include conveyor designed to transport materials, and routing of fill material; construction methods and equipment, dredging, barges, conveyors, scrapers, etc, are discussed.
Building 13-mile causeway across sea of salt
Methods and problems in moving 31,500,000 cu yd of rock and gravel fill into place, for railroad causeway across arm of Great Salt Lake, Utah, are described; features of work described include conveyor designed to transport materials, and routing of fill material; construction methods and equipment, dredging, barges, conveyors, scrapers, etc, are discussed.
Building 13-mile causeway across sea of salt
World Construction
Glidden, H.K. (author)
World Construction ; 11
1958
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four-mile causeway carries state road over swamp
Engineering Index Backfile | 1924
|Possibility of building causeway across strait of canso
Engineering Index Backfile | 1949
Engineering Index Backfile | 1945
Engineering Index Backfile | 1909
|The Great Salt Lake Causeway - A Calculated Risk Revisited
British Library Conference Proceedings | 1988
|