A platform for research: civil engineering, architecture and urbanism
Raising with suspended work cage at Irene shaft, Leadville, Colo
Method used involved driving raw, 6-ft diam ventilation rise and emergency escapeway, using work cage that was suspended on hoisting rope extended down small diameter drill hole; preparation and raising period; costs and safety.
Raising with suspended work cage at Irene shaft, Leadville, Colo
Method used involved driving raw, 6-ft diam ventilation rise and emergency escapeway, using work cage that was suspended on hoisting rope extended down small diameter drill hole; preparation and raising period; costs and safety.
Raising with suspended work cage at Irene shaft, Leadville, Colo
U S Bur Mines -- Information Cir
Bolmer, R.L. (author) / Greenlee, B.B. (author)
1958
27 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Leadville drainage tunnel, second project, lake County, Colo
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1951
Structural geology at Leadville
Engineering Index Backfile | 1907
|