A platform for research: civil engineering, architecture and urbanism
A new hydroelectric plant in Oregon
Extracts from a paper by Herman V. Schreiber, read before the Nat. Assn. of Cement Users. Describes a plant on the Clackamas River, 40 miles east of Portland, having a concrete dam and power house built on fissured volcanic rock foundations, made solid by grouting. (4500 w.) (No. 31481)
A new hydroelectric plant in Oregon
Extracts from a paper by Herman V. Schreiber, read before the Nat. Assn. of Cement Users. Describes a plant on the Clackamas River, 40 miles east of Portland, having a concrete dam and power house built on fissured volcanic rock foundations, made solid by grouting. (4500 w.) (No. 31481)
A new hydroelectric plant in Oregon
Eng Rec
1912
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A $3,000,000 hydroelectric development in Oregon
Engineering Index Backfile | 1927
|Schluchsee Hydroelectric Plant
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1913