A platform for research: civil engineering, architecture and urbanism
Column forms, sawed in half, are placed by crane
Construction of reinforced-concrete $2,500,000 bridge and viaduct across Los Angeles River at Los Angeles; total length is 3546 ft including two 149-ft bowstring steel arches.
Column forms, sawed in half, are placed by crane
Construction of reinforced-concrete $2,500,000 bridge and viaduct across Los Angeles River at Los Angeles; total length is 3546 ft including two 149-ft bowstring steel arches.
Column forms, sawed in half, are placed by crane
Construction Methods
Construction Methods ; 14
1932
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sawed joints in concrete pavement
Engineering Index Backfile | 1953
|Investigation of sawed joints in concrete pavements
Engineering Index Backfile | 1954
DOAJ | 2020
|