A platform for research: civil engineering, architecture and urbanism
New tunnel eliminates seven grade crossings
Construction of single-track concrete-lined tunnel, 4600 ft long, driven by Canadian Pacific at Vancouver, BC, to connect its Front and False Creek yards; borings used to check alignment; basis of bidding; profile of tunnel showing relative length, in gravel and in rock; concreting operations; drainage.
New tunnel eliminates seven grade crossings
Construction of single-track concrete-lined tunnel, 4600 ft long, driven by Canadian Pacific at Vancouver, BC, to connect its Front and False Creek yards; borings used to check alignment; basis of bidding; profile of tunnel showing relative length, in gravel and in rock; concreting operations; drainage.
New tunnel eliminates seven grade crossings
Ry Age
Alexander, F.W. (author)
Railway Age ; 93
1932
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erie eliminates 15 grade crossings at Elmira, NY
Engineering Index Backfile | 1935
Wawona highway tunnel eliminates inspiration point grade
Engineering Index Backfile | 1934
|Online Contents | 2012
Online Contents | 2001
Online Contents | 1996