Wawona highway tunnel eliminates inspiration point grade
Construction of Yosemite Valley, Calif, vehicular tunnel 4230 ft long on tangent (5% grade), with width of 28 ft and height of 19 ft, concrete-paved throughout; ventilating setup; automatic carbon-monoxide recorders.
Wawona highway tunnel eliminates inspiration point grade
Construction of Yosemite Valley, Calif, vehicular tunnel 4230 ft long on tangent (5% grade), with width of 28 ft and height of 19 ft, concrete-paved throughout; ventilating setup; automatic carbon-monoxide recorders.
Wawona highway tunnel eliminates inspiration point grade
Western Construction News
Thomson, C.G. (author)
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New tunnel eliminates seven grade crossings
Engineering Index Backfile | 1932
|New express highway eliminates war traffic bottleneck
Engineering Index Backfile | 1943
|Grade separation eliminates traffic hazards to shipyard workers
Engineering Index Backfile | 1943
|Erie eliminates 15 grade crossings at Elmira, NY
Engineering Index Backfile | 1935
Warrants for Highway - Highway Grade Separations
NTIS | 1974
|