A platform for research: civil engineering, architecture and urbanism
Difficult subway construction in sand
Difficulties encountered on half-mile contract for 55-mi independent city-owned subway system at point in Brooklyn where it passes under existing subway structure already occupying most of street; complicated interweaving of tracks; load of roof transferred to girders; settlement taken up by jacks.
Difficult subway construction in sand
Difficulties encountered on half-mile contract for 55-mi independent city-owned subway system at point in Brooklyn where it passes under existing subway structure already occupying most of street; complicated interweaving of tracks; load of roof transferred to girders; settlement taken up by jacks.
Difficult subway construction in sand
Civ Eng (NY)
Monaghan, J.R. (author) / Fitzgerald, Jr., J.J. (author) / Peckworth, H.F. (author)
1932
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficult subway construction in sand
Engineering Index Backfile | 1933
|Constructing A difficult subway with consummate skll
Engineering Index Backfile | 1924
|Construction method for backfilling sand and gravel above subway station
European Patent Office | 2020
|Engineering Index Backfile | 1950
|European Patent Office | 2021
|