A platform for research: civil engineering, architecture and urbanism
Precise method for effecting change of cross-section from normal camber assuming that normal camber at beginning would consist of two straight sides with arc of curve joining that tangentially to form crown; method of application to practice.
Precise method for effecting change of cross-section from normal camber assuming that normal camber at beginning would consist of two straight sides with arc of curve joining that tangentially to form crown; method of application to practice.
Super-elevation in highway construction
Surveyor
Platts, H.C. (author)
Surveyor ; 81
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Practice of super-elevation of highway curves
Engineering Index Backfile | 1931
|Construction details on Ohio super-highway
Engineering Index Backfile | 1928
Stage construction plan wins super-highway contest
Engineering Index Backfile | 1927
|Ventilating Pennsylvania's super-highway
Engineering Index Backfile | 1940
Super-thick soft highway subgrade reinforcing device and construction method thereof
European Patent Office | 2024
|