A platform for research: civil engineering, architecture and urbanism
Concrete core earth-fill dam 35 ft max height, forming reservoir having capacity of 200,000,000 gal, for City of Gloucester, Mass; total cost including appurtenances was $307,000.
Concrete core earth-fill dam 35 ft max height, forming reservoir having capacity of 200,000,000 gal, for City of Gloucester, Mass; total cost including appurtenances was $307,000.
Babson Reservoir -- Built in six months
Am City
Myott, E.B. (author)
American City ; 47
1932
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydro plant built in 13 months
Engineering Index Backfile | 1951
An Interview with Samuel D. Dunn, P.E., Ph.D. Chief Information Officer, Babson College, USA
British Library Online Contents | 2010
|5-mile James river bridge built in 13 months
Engineering Index Backfile | 1929
Plane modification center designed and built in four months
Engineering Index Backfile | 1944