A platform for research: civil engineering, architecture and urbanism
Hydro plant built in 13 months
Idaho Power Co plant in valley of Snake river involves dam, with concrete spillway and powerhouse with three 30,000-kva generating units; dam of earthfill type, 132 ft high having impervious core, forms reservoir of 37,000 acre ft; power house has installed capacity of 90,000 kw at static head of 90 ft; ample working space and tight construction schedule helped to complete $20,000,000 work in 13 mo.
Hydro plant built in 13 months
Idaho Power Co plant in valley of Snake river involves dam, with concrete spillway and powerhouse with three 30,000-kva generating units; dam of earthfill type, 132 ft high having impervious core, forms reservoir of 37,000 acre ft; power house has installed capacity of 90,000 kw at static head of 90 ft; ample working space and tight construction schedule helped to complete $20,000,000 work in 13 mo.
Hydro plant built in 13 months
Western Construction
Western Construction ; 26
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Power plant in Northern Ontario largely built during winter months
Engineering Index Backfile | 1931
|Babson Reservoir -- Built in six months
Engineering Index Backfile | 1932
|Largest hydro-electric plant of the orient being built in chosen, Japan
Engineering Index Backfile | 1929
|5-mile James river bridge built in 13 months
Engineering Index Backfile | 1929
Plane modification center designed and built in four months
Engineering Index Backfile | 1944