A platform for research: civil engineering, architecture and urbanism
Dredging and pumping systems, embodying equipment carefully designed and selected and properly used, will show sizeable savings on many projects; application of dredging method exemplified by new fill on Indianapolis railroad; dredging equipment.
Dredging and pumping systems, embodying equipment carefully designed and selected and properly used, will show sizeable savings on many projects; application of dredging method exemplified by new fill on Indianapolis railroad; dredging equipment.
Embankments constructed by hydraulic methods
Ry Eng Maintenance
Nagle, P. (author)
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Methods and Quality of Embankments Constructed in Winter
ASCE | 2017
|Embankments constructed on soft soil deposits
British Library Conference Proceedings | 1996
|Performance of embankments constructed over peat
Engineering Index Backfile | 1969
|Properties of Embankments Constructed in Winter
ASCE | 2013
|