A platform for research: civil engineering, architecture and urbanism
Constructing highest hydraulic fill dam at cobble mountain
Methods of blasting and hydraulicking used in construction of dam 222 ft high; 56,000 yd rock excavation in spillway channel; part of rock borrowed from convenient quarry sites; 160,000 yd placed by all hydraulic methods. (See also Excavating Engr v 26 n 4 Apr 1932 p 183-7, 216, 218 and 220)
Constructing highest hydraulic fill dam at cobble mountain
Methods of blasting and hydraulicking used in construction of dam 222 ft high; 56,000 yd rock excavation in spillway channel; part of rock borrowed from convenient quarry sites; 160,000 yd placed by all hydraulic methods. (See also Excavating Engr v 26 n 4 Apr 1932 p 183-7, 216, 218 and 220)
Constructing highest hydraulic fill dam at cobble mountain
Eng Contracting
Hatch, H.H. (author)
1932
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Constructing highest hydraulic fill dam at cobble mountain
Engineering Index Backfile | 1932
|Hydraulic fill construction at cobble mountain dam
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1934
|Engineering Index Backfile | 1929
|Tunnel driving at cobble mountain
Engineering Index Backfile | 1931
|