A platform for research: civil engineering, architecture and urbanism
Construction methods on Welland ship canal
History of Welland Ship Canal; construction contracts; labor rates; summary of costs; earth excavation; unit prices for earth excavation; comparison of dimensions of dredges used; hydraulic dredge operating costs; rock excavation; method of close drilling; contract prices for concrete; traveling forms; concrete cribs; Chippawa Creek siphon culvert.
Construction methods on Welland ship canal
History of Welland Ship Canal; construction contracts; labor rates; summary of costs; earth excavation; unit prices for earth excavation; comparison of dimensions of dredges used; hydraulic dredge operating costs; rock excavation; method of close drilling; contract prices for concrete; traveling forms; concrete cribs; Chippawa Creek siphon culvert.
Construction methods on Welland ship canal
Am Soc Civ Engrs -- Proc
Cameron, E.G. (author)
1932
69 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction methods on Welland Ship Canal
Engineering Index Backfile | 1933
|Construction Methods on the Welland Ship Canal
ASCE | 2021
|Construction methods on the Welland ship canal
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1931
Crib construction for Welland ship canal
Engineering Index Backfile | 1915