A platform for research: civil engineering, architecture and urbanism
Construction methods on the Welland ship canal
History of project; cost distribution; earth excavation; dredging operations; rock excavation; excavating and loading costs; lock construction; form work; concrete handling and form moving in flight locks; Chippewa Creek siphon culvert.
Construction methods on the Welland ship canal
History of project; cost distribution; earth excavation; dredging operations; rock excavation; excavating and loading costs; lock construction; form work; concrete handling and form moving in flight locks; Chippewa Creek siphon culvert.
Construction methods on the Welland ship canal
Am. Soc. Civil Engrs. -- Proc
Cameron, E.G. (author)
1929
17 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction methods on Welland ship canal
Engineering Index Backfile | 1932
|Construction methods on Welland Ship Canal
Engineering Index Backfile | 1933
|Construction Methods on the Welland Ship Canal
ASCE | 2021
|Engineering Index Backfile | 1931
Crib construction for Welland ship canal
Engineering Index Backfile | 1915