A platform for research: civil engineering, architecture and urbanism
Floor placed first in erecting large steel arch
Two-hinged, braced steel arch, 547-ft span with two 20-ft deep parabolic parallel-chord truss ribs of 34 panels, over Merrimack River north of Lowell, Mass; floor steel was laid on timber falsework and arch trusses then erected, utilizing hangers as posts.
Floor placed first in erecting large steel arch
Two-hinged, braced steel arch, 547-ft span with two 20-ft deep parabolic parallel-chord truss ribs of 34 panels, over Merrimack River north of Lowell, Mass; floor steel was laid on timber falsework and arch trusses then erected, utilizing hangers as posts.
Floor placed first in erecting large steel arch
Eng News-Rec
Engineering News-Record ; 108
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erecting a large steel arch bridge in England
Engineering Index Backfile | 1928
Erecting the Sydney harbor steel-arch bridge
Engineering Index Backfile | 1930
Erecting a 750 ft. steel arch without falsework
Engineering Index Backfile | 1931
|Old timber truss bridge used for erecting steel arch
Engineering Index Backfile | 1926
|