A platform for research: civil engineering, architecture and urbanism
Development of erection of girder bridges
Review of progress in methods of placing steel spans; gin poles, gallows frames, and hand tackle superseded by locomotive cranes, up to 100 tons in capacity, by steel movable derricks, and booms up to 80 ft in length; girder-erection methods; launching of span with cableway; erection with traveling towers, and on intermediate crib pier; girders erected by transverse displacement. (See also Gen Contractors Assn -- Bul v 23 n 9 Sept 1932 p 197-203)
Development of erection of girder bridges
Review of progress in methods of placing steel spans; gin poles, gallows frames, and hand tackle superseded by locomotive cranes, up to 100 tons in capacity, by steel movable derricks, and booms up to 80 ft in length; girder-erection methods; launching of span with cableway; erection with traveling towers, and on intermediate crib pier; girders erected by transverse displacement. (See also Gen Contractors Assn -- Bul v 23 n 9 Sept 1932 p 197-203)
Development of erection of girder bridges
Civ Eng (NY)
Skinner, F.W. (author)
1932
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of erection of girder bridges
Engineering Index Backfile | 1932
|The erection of girder bridges
Engineering Index Backfile | 1909
|Design and erection of curved girder bridges
Engineering Index Backfile | 1965
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|Fabrication and erection of steel plate girder railway bridges
Engineering Index Backfile | 1954
|