A platform for research: civil engineering, architecture and urbanism
Mechanical behaviour of Kurobe IV dam and its foundation -- Especially difference from result of calculation
After completion of Kurobe IV dam, raising of reservoir water level is limited to 10 m/yr; mechanical behavior of dam and its foundation under gradually increasing load are being carefully observedby many measuring devices; field data, thus obtained, on stress and displacement of arch and deformation of rock mass are compared with results of calculation, and causes of difference are described.
Mechanical behaviour of Kurobe IV dam and its foundation -- Especially difference from result of calculation
After completion of Kurobe IV dam, raising of reservoir water level is limited to 10 m/yr; mechanical behavior of dam and its foundation under gradually increasing load are being carefully observedby many measuring devices; field data, thus obtained, on stress and displacement of arch and deformation of rock mass are compared with results of calculation, and causes of difference are described.
Mechanical behaviour of Kurobe IV dam and its foundation -- Especially difference from result of calculation
Int Congress on Large Dams
9th International Congress on Large Dams ; 1967 ; Turkey , Istanbul
1967
19 pages
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
30 years behavior of rock foundation of Kurobe Dam - Result of measurement at 186 m height Arch Dam
British Library Conference Proceedings | 1995
|Kurobe River no. 4 H.E. scheme
Engineering Index Backfile | 1961
|Kurobe-shi Kokusei Bunnka Center/Colare
British Library Online Contents | 1996
|Characteristics of staged construction in Kurobe dam
British Library Conference Proceedings | 1994
|Kurobe Dam to Be 630 Ft domed arch
Engineering Index Backfile | 1958