A platform for research: civil engineering, architecture and urbanism
Norrkoping method for industrial construction of houses
Prefabrication of concrete units to be used for housing construction on large scale in Norrkoping, Sweden; production includes foundation and facing elements, balcony facings, floor slabs and other units; units for gables are profiled; time of assembly of house containing 24 apartments is calculated at 11 days.
Norrkoping method for industrial construction of houses
Prefabrication of concrete units to be used for housing construction on large scale in Norrkoping, Sweden; production includes foundation and facing elements, balcony facings, floor slabs and other units; units for gables are profiled; time of assembly of house containing 24 apartments is calculated at 11 days.
Norrkoping method for industrial construction of houses
Norrkopingsmetoden for tillverkning av industriellt framstallda bostadshus
Satmark, H. (author)
Cement and Betong ; 41
1966
5 pages
Article (Journal)
Swedish
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1999
Straßenbahn Norrköping wird erweitert
IuD Bahn | 2007
|Online Contents | 1999
The Regeneration of the Industrial Landscape in Norrkoping
British Library Conference Proceedings | 1999
|Tullhusbron, Norrköping. Erik Andersson Arkitektbyrå.
Online Contents | 2013