A platform for research: civil engineering, architecture and urbanism
Job-keyed equipment speeds runway pours
To pave 50 acres of overwater runway at New York's LaGuardia Airport, radio remote-controlled concrete mixing plant delivered 54,000 cu yd of concrete into chain of high-speed belt conveyors up to 400 ft in length; 2 in. diam air and electric vibrators work concrete around reinforcement; screeds of basic 3 × 3 ft by 32 ft wide truss, which can be extended, follow concrete placing crews and finishes deck to 1/8 in. tolerance.
Job-keyed equipment speeds runway pours
To pave 50 acres of overwater runway at New York's LaGuardia Airport, radio remote-controlled concrete mixing plant delivered 54,000 cu yd of concrete into chain of high-speed belt conveyors up to 400 ft in length; 2 in. diam air and electric vibrators work concrete around reinforcement; screeds of basic 3 × 3 ft by 32 ft wide truss, which can be extended, follow concrete placing crews and finishes deck to 1/8 in. tolerance.
Job-keyed equipment speeds runway pours
Construction Methods Equipment
1966
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
British Library Online Contents | 1992
|Taylor & Francis Verlag | 1974
Engineering Index Backfile | 1961
LARGE AREA POURS - Readers' Letters
Online Contents | 2005