Wire mesh speeds slab pours
New York contractor poured 10,000 sq ft concrete slabs in 3-day cycles for construction of 12-story apartment building; fast work was made possible by substitution of welded wire fabric for conventional bar reinforcement and efficient work schedule that literally has all trades working simultaneously.
Wire mesh speeds slab pours
New York contractor poured 10,000 sq ft concrete slabs in 3-day cycles for construction of 12-story apartment building; fast work was made possible by substitution of welded wire fabric for conventional bar reinforcement and efficient work schedule that literally has all trades working simultaneously.
Wire mesh speeds slab pours
Construction Methods Equipment
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Job-keyed equipment speeds runway pours
Engineering Index Backfile | 1966
British Library Online Contents | 1992
|Taylor & Francis Verlag | 1974
Engineering Index Backfile | 1961
Placement: Record concrete pours - A case study comparison of major concrete raft foundation pours
British Library Online Contents | 1998
|