A platform for research: civil engineering, architecture and urbanism
Design and performance of mammoth pool power tunnel
Design criteria for 7 1/2 mi long hydroelectric power tunnel for Mammoth Pool Hydroelectric Project on San Joaquin River, Calif; performance record of unlined pressure tunnel, placed in igneous and metamorphic rocks; hydraulic, structural and economic aspects are described and actual contract costs are presented together with contract and specification provisions used to control construction work.
Design and performance of mammoth pool power tunnel
Design criteria for 7 1/2 mi long hydroelectric power tunnel for Mammoth Pool Hydroelectric Project on San Joaquin River, Calif; performance record of unlined pressure tunnel, placed in igneous and metamorphic rocks; hydraulic, structural and economic aspects are described and actual contract costs are presented together with contract and specification provisions used to control construction work.
Design and performance of mammoth pool power tunnel
ASCE -- Proc (J Power Div)
Laverty, B.R. (author) / Ludwig, K.R. (author)
1963
35 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete for Mammoth pool power tunnel
Engineering Index Backfile | 1961
|Construction planning of mammoth pool project
Engineering Index Backfile | 1962
|Mammoth Pool Dam Seismic Fragility Analysis
British Library Conference Proceedings | 2010
|Construction Planning of Mammoth Pool Project
ASCE | 2021
|Homogenization performance of mammoth silos
British Library Online Contents | 2006
|