A platform for research: civil engineering, architecture and urbanism
Concrete for Mammoth pool power tunnel
Eight mi long 20 ft diam tunnel is integral part of Big Creek hydroelectric power project in California; description of concrete mixing and placing for tunnel lining; numerical tables show data on construction specifications, on test results of fresh and hardened concrete, and mix proportions used; satisfactory, 2000 psi, concrete in tunnel invert was produced from local crushed aggregate using as little as 325 lb of cement/cu yd.
Concrete for Mammoth pool power tunnel
Eight mi long 20 ft diam tunnel is integral part of Big Creek hydroelectric power project in California; description of concrete mixing and placing for tunnel lining; numerical tables show data on construction specifications, on test results of fresh and hardened concrete, and mix proportions used; satisfactory, 2000 psi, concrete in tunnel invert was produced from local crushed aggregate using as little as 325 lb of cement/cu yd.
Concrete for Mammoth pool power tunnel
Am Concrete Inst -- J
Long, N.S. (author) / Howell, T.W. (author)
1961
18 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and performance of mammoth pool power tunnel
Engineering Index Backfile | 1963
|Mammoth Pool Dam Seismic Fragility Analysis
British Library Conference Proceedings | 2010
|Construction planning of mammoth pool project
Engineering Index Backfile | 1962
|Construction Planning of Mammoth Pool Project
ASCE | 2021
|Engineering Index Backfile | 1948