A platform for research: civil engineering, architecture and urbanism
Submerged weir on Niagara river
Illustrated description of concrete weir having total length of 935 ft and of temporary steel pier which served as base for building operations during construction of submerged weir.
Submerged weir on Niagara river
Illustrated description of concrete weir having total length of 935 ft and of temporary steel pier which served as base for building operations during construction of submerged weir.
Build submerged weir in turbulent Niagara River
Engineering Index Backfile | 1943
Build submerged weir to increase Niagara power
Engineering Index Backfile | 1943
Prestressed bridge designed for crane load at Niagara River Weir
Engineering Index Backfile | 1956
|Cableway speeds rock placing in Niagara Falls weir
Engineering Index Backfile | 1943
NTIS | 1973
|