A platform for research: civil engineering, architecture and urbanism
Cableway speeds rock placing in Niagara Falls weir
To build submerged weir in Niagara River, cableway 1/2 mi long was erected between tall tower on artificial island and head tower on Ontario shore; cableway handled up to 500 tons of rock per 10-hr day; layout and operation of cableway, towers and propulsion equipment given.
Cableway speeds rock placing in Niagara Falls weir
To build submerged weir in Niagara River, cableway 1/2 mi long was erected between tall tower on artificial island and head tower on Ontario shore; cableway handled up to 500 tons of rock per 10-hr day; layout and operation of cableway, towers and propulsion equipment given.
Cableway speeds rock placing in Niagara Falls weir
Construction Methods
1943
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Submerged weir on Niagara river
Engineering Index Backfile | 1939
Niagara Falls Intake Tunnel, City of Niagara Falls, New York
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1913
Build submerged weir in turbulent Niagara River
Engineering Index Backfile | 1943
Build submerged weir to increase Niagara power
Engineering Index Backfile | 1943