A platform for research: civil engineering, architecture and urbanism
Design and construction of single track masonry lined railroad tunnel, 8 km long under Gaduk mountain pass on Trans-Iranian railroad
Study of geological strata; list of construction equipment used; cost data. (see also - n 47/48 Nov 3 1939 p 593-8)
Design and construction of single track masonry lined railroad tunnel, 8 km long under Gaduk mountain pass on Trans-Iranian railroad
Study of geological strata; list of construction equipment used; cost data. (see also - n 47/48 Nov 3 1939 p 593-8)
Design and construction of single track masonry lined railroad tunnel, 8 km long under Gaduk mountain pass on Trans-Iranian railroad
Der Bau des Scheiteltunnels der Elburs-Nordrampe der Transiranischen Eisenbahn
von Rabcewicz, L. (author)
Bautechnik ; 17
1939
3 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of collapsed portion of railroad tunnel No. 31 along new Trans-Iranian railroad
Engineering Index Backfile | 1937
|Reconstruction of collapsed portion of railroad tunnel No. 31 along new Trans-Iranian railroad
Engineering Index Backfile | 1937
|Mountain Railroad Construction
ASCE | 2021
|Engineering Index Backfile | 1900
|