A platform for research: civil engineering, architecture and urbanism
Design and construction of so-called elastic mooring posts consisting of clusters of 4, 6 or 9 concrete capped steel piles. (See also Bautechnik v 17 n 3 Jan 20 1939 p 42-4)
Design and construction of so-called elastic mooring posts consisting of clusters of 4, 6 or 9 concrete capped steel piles. (See also Bautechnik v 17 n 3 Jan 20 1939 p 42-4)
Neuartiger Stahldalben
Neuartiger Stahldalben
Wegner, E. (author)
Genie Civil ; 114
1939
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
|Neuartiger Löschpulverumschlag
Tema Archive | 1996
Hochtemperaturverhalten neuartiger Betone
Wiley | 2018
|